A signed builder contract is only the start. Use this Idaho pre-close checklist to make sure the scope, plans, budget, schedule, permits, and draw milestones all describe the same project.
In This Guide
A builder contract can be binding yet leave a construction-loan file incomplete. Before closing, the lender needs the project the builder priced, the appraiser will value, and the permit office will review. The agreement, plans, specifications, budget, schedule, site documents, and addenda should reconcile.
Think of the contract as the index for the rest of the file. A plan page, allowance sheet, or site estimate that is not identified in the agreement can leave a reviewer unsure whether it belongs to the financed scope. Give each attachment a date or revision identifier so the borrower, builder, lender, and appraiser can work from the same version.
Ask what the builder delivers for the contract price, Put each inclusion in the contract, an exhibit, or a responsibility matrix naming the responsible party.
For rural Idaho projects, check well, septic, power extension, access, grading, survey, and driveway costs. For demolition or an existing structure, assign permits, disposal, and when work begins.
Measurable does not mean every selection must be made before signing. It means the file states a defined standard when a final product is pending and identifies who can approve a substitution. That record helps distinguish a selection within an allowance from a change that alters the approved scope or cost.
Plans show the home’s shape; specifications identify its components. Replace “premium appliances” or “owner selection” with a brand and model, finish schedule,. Each allowance should show its amount, included labor or installation, selection responsibility, and treatment of an overage or unavailable product.
If square footage, floor plan, windows, cabinetry, or finish level changes, preserve the revision and send it for lender direction. For why documents matter to value, see why a construction-loan appraisal is based on a home that does not exist yet.
Start with the contract total and trace each amount once. If a cost sits outside the builder’s agreement, label it separately rather than burying it in a general allowance. This makes it easier to see whether the plans, budget, site estimates, and appraisal exhibits describe the same all-in project.
The agreement total should roll into a line-item budget without gaps or double counts. Separate hard construction costs from plans, engineering, permits, insurance, taxes, title items, site improvements. Show land or existing equity separately.
The start trigger may depend on loan closing, permit issuance, site access, or another stated event. Identify dependencies that could move a milestone, including review corrections, utility coordination, material lead times, weather, and rural access. The goal is not an exact prediction, but visible assumptions behind the completion target.
“About a year” is not a lender-ready schedule. Identify the trigger, then show milestones, long-lead procurement, completion, and final inspections or certificate of occupancy where applicable.
Assign permit responsibility. Boise requires building permits and plan-review approval for new residential construction, but Idaho requirements differ by jurisdiction. Confirm city, county, utility, requirements. “Permit in process” needs details about plans, corrections, fees, and separate trade permits.
Draw language works best when a third party can see what has been completed without interpreting a broad promise. The contract need not duplicate the lender’s draw form, but its stages should not conflict with the budget or planned inspection sequence. Confirm documentation timing early so a request is not held up by a missing record.
A payment schedule should describe work. For each draw milestone, identify completed work, its amount or percentage, and expected inspection, invoice, lien-waiver, or other evidence. Have the lender confirm fit; no universal Idaho schedule applies.
Avoid a large early payment without verifiable progress or a final payment before completion documentation. For inspections, draw requests, and lien waivers, read Construction Loan Draw Schedule Explained (Idaho).
Keep each signed change order with the document version it changes. That creates a clear sequence when a later reviewer compares the completed home with the plans, specifications, amendments, and budget in the file. Do not rely on memory to reconcile a field decision made months earlier.
Require a written change order stating revised scope, price effect, time effect, signatures, and updated plan, specification, or budget pages. Keep it with the original exhibits; a text or jobsite conversation is not adequate authorization for a material change.
Ask whether the lender must review it.
Use one current packet rather than sending isolated revisions as they become available. A revision date on the plans, specifications, schedule, and budget helps identify the controlling set. Ask which items are needed before closing and which evidence will be requested as work proceeds, because requirements can depend on the project and program.
Before signing or closing, send one current packet. A typical review includes the executed agreement and addenda, current plans and specifications, budget, schedule, builder registration and insurance, permit status, survey or site information when applicable, title or ownership documents, and appraisal exhibits. Requirements vary; current program requirements control.
Verify that an Idaho contractor is currently registered and insured as applicable; Idaho uses contractor registration rather than a blanket state contractor-license label. To check a builder file, start with How to Find a Builder for a Construction Loan in Idaho.
Pause for unpriced allowances, “TBD” scope, contradictory totals, an undefined permit owner, front-loaded payments, no realistic completion target, no change-control process, or a plan set different from the contract. Correct these before closing.
Route special project types before assuming standard terms apply. An eligible barndominium or pole-barn home follows a separate path with an 80% maximum LTV, subject to the current conforming loan limit; that safeguard is separate from standard construction. A lot purchase is also separate from construction financing. A gut remodel, demolition, major reconstruction, or rebuild may need construction-to-permanent review after the project, plans, budget, and property are reviewed.
A complete packet supports informed review; it does not promise approval, appraisal support, underwriting clearance, or funding. Text Matt before you sign the final builder contract, or contact the construction team to review the project file, lender requirements, and open questions together.